Eldosouky, I., Ibrahim,, A., Mohammed, H. (2014). 'APPROACH FOR DETERMINATION OF COST CONTINGENCY RESERVE IN CONSTRUCTION PROJECTS', The Egyptian International Journal of Engineering Sciences and Technology, 17(4), pp. 4-5. doi: 10.21608/eijest.2014.97092